Next step was to finish the inbound tracks for Northwestern wood
preservers mill for tankcars,boxcars and from time to time some hoppers.
The deliver the other goods needed for manufacturing plywood etc. The
tracks will be glued down on some 2mm cork. The buidlings are only
mockups and will be changed later.
Left
track will be for tankcars, right track for boxcars in the background
between the buildings and hoppers. I´m waiting for the curved Peco
turnout to finish trackwork.
Another change i made was on the Canfor planer mill. There was a wooden
post on the front corner of that area and distrubed the whole look of
this place. After some thoughts I cut it away. It looks way better now.
|
before picutre with the post |
|
After i have removed it. |
|
Two Alco´s sitting on the main. |
|
Main is on the left with the Alco´s and the entrance to the Canfor mill is on the right side. |
Thank You for following my blog,
Cheers,Chris